Cisco 300-160 Exam Description

Cisco CCNP Data Center 300-160 tests a candidate's knowledge of data center infrastructure design related to deployment requirements and alternatives for network connectivity, infrastructure, storage network, compute connectivity, and compute resource parameters.

The Designing Cisco Data Center Infrastructure (DCID) exam (300-160) is often a 90-minute, 60-70 question assessment. This exam is one of the exams associated with the CCNP Data Center Certification. This exam tests a candidate's expertise in Cisco data center infrastructure design related to deployment requirements and choices for network connectivity, infrastructure, storage network, compute connectivity, and compute resource parameters.
Cisco 300-160 Exam Overview:
Exam Number: 300-160 DCID
Associated Certifications: CCNP Data Center
Duration: 90 minutes (60-70 questions)
Available Languages: English
Exam Registration: Pearson VUE
Cisco 300-160 Exam Topics in more detail:
Data Center Network Connectivity Design (24%)
1 Evaluate options for Layer 2 connectivity in order to meet deployment requirements inside the data center
a) Endpoint mobility
b) Redundancy / high availability
c) Convergence
d) Services insertion

2 Evaluate selections for Layer 3 connectivity in order to meet deployment requirements within the data center
a) IP mobility
b) Redundancy / high availability
b) [i] Graceful restart / NSF
c) Convergence
d) Services insertion
d) [i] Load balancing
d) [ii] Security
Data Center Infrastructure Design (21%)
1 Evaluate data center protocols to fulfill deployment requirements
a) Fabric Path
b) OTV
c) VXLAN
d) LISP
e) VPC/VPC+

2 Evaluate options for orchestration and management in the data center
a) Orchestration and automation
b) Out-of-band management network
c) License management

3 Evaluate options for tool and routing virtualization in the data center
a) VDC
b) VRF

4 Evaluate alternatives for interconnecting data centers
Data Center Storage Network Design (21%)
1 Plan for iSCSI deployment from the data center
a) Multipathing
b) Addressing schemes

2 Evaluate QoS requirements in the data center
a) Fibre Channel
b) FCoE
c) FCIP
d) iSCSI

3 Determine FCoE/ Fibre Channel interface parameters determined by data center requirements
a) Dedicated and shared mode
b) Port types
c) ISL
d) Oversubscription



4 Evaluate SAN Topology options inside the data center
a) Fabric redundancy
b) NPV, NPIV, and FCF
c) Load balancing
Data Center Compute Connectivity Design (19%)
1 Evaluate selections for Ethernet connectivity to meet deployment requirements within a data center
a) Redundancy / high availability
b) Bandwidth
b) [i] Over subscription
c) Fabric interconnect operation mode
c) [i] Switch mode
c) [ii] End host mode

2 Evaluate choices for storage connectivity to fulfill deployment requirements inside a data center
a) Multipathing
b) Bandwidth
b) [i] Port channels
b) [ii] Oversubscription
c) Fabric interconnect operation mode
c) [i] Switch mode
c) [ii] End host mode
d) Direct-attached storage
d) [i] Appliance port
d) [ii] Fibre Channel storage port
d) [iii] FCoE port
Data Center Compute Resource Parameters Design (15%)
1 Evaluate alternatives for orchestration and automation from the data center
a) Service profile templates
b) vNIC templates
c) vHBA templates
d) Global policies vs local policies

2 Evaluate options for management network in the data center
a) In-band
b) Out-of-band

3 Evaluate alternatives for network device virtualization within a dat